Please ensure Javascript is enabled for purposes of website accessibility NUITS SONORES | Audiovisual & Power
NUITS SONORES
Secteur

NUITS SONORES

NUITS SONORES

From 28th may to 1st june 2025 | Lyon

The 22nd edition of Nuits Sonores was held in Lyon from May 28 to June 1, 2025. Over five days and four nights, the festival transformed the city with its multiple stages, forward-thinking programming, and distinctive atmosphere, combining musical exploration, celebration, and human connection.

For this edition, GL events Audiovisual & Power delivered comprehensive technical support across the entire event. Our teams were responsible for sound reinforcement, lighting design, video production, and power distribution throughout the various festival sites.

contact An expert

Blocs éditoriaux
0
loudspeakers
0
weatherproof lighting fixtures
0
festival-goers
Ckeditor

CUSTOMER NEEDS

  • Ensure audio coverage across multiple large-scale stages
  • Provide lighting adapted to diverse environments
  • Deliver reliable and secure power distribution for all areas
Ckeditor

 

OUR TECHNICAL SOLUTIONS

  • Lighting of the festival’s various stages

Our teams illuminated all stages at Nuits Sonores, from La Sucrière to the Grandes Locos, using Robe Forte, Megapointe, Esprite, Ayrton Zonda and Rivale, Martin Mac Aura XIP and PXL, as well as Starway Quasar and Aqua 580 fixtures. The lighting control was managed via a grandMA3 console, integrated into a full stage structure and technical grid.

  • Sound reinforcement on main stages

GL events Audiovisual & Power provided sound reinforcement across all festival stages using a comprehensive L-Acoustics line array system including K1, K2, KS28, KARA, A15, KS21 and X15 speakers. Amplification was delivered via LA4X and LA12X controllers, with mixing handled through Yamaha DM7 and CL5 consoles. This configuration ensured powerful, uniform and precisely managed sound coverage, tailored to the scale of the industrial venues.

  • Video installation for scenography and information

A 14 x 7.5 m LED screen with a 3.9 mm pitch was installed, totaling over 5 tons of video structure integrated into the scenographic design. We also deployed multiple LCD information displays across the sites to guide attendees and support festival signage.

  • Power distribution for stages and logistical areas

Our teams managed the complete power distribution for the festival, covering technical, scenic and operational needs across all spaces. This included the supply of over 800 weatherproof lighting sources, emergency lighting, bar area lighting, and logistical signage across circulation zones and service areas.

Ckeditor

 Do you have an events project ?

contact An expert